AI Compute

Server Rack Installation
& Build-Out

Receive, rack, cable, label, validate. Whether it is a single 42U for a co-lo cage or a 32-node AI cluster, we handle it from the loading dock to commissioning.

What we deliver

Server Rack Installation & Build-Out — done right.

You bring the cluster design. We do everything from the loading dock to commissioning.

Every rack install starts with the receive: dock-to-cage chain of custody, asset tagging, photo documentation. Then rail kits, busbar lugs, side-panel-off cabling, labeling, and physical inventory. Finished with burn-in and a clean as-built package handed back to your team.

  • GPU rack installs — H100, H200, B200, MI300X
  • Rail kits, busbar lugs, side-panel cabling
  • Asset tagging, photo documentation, as-builts
  • Up to 80 kW per rack, high-density support
  • Pre-stage and burn-in at our facility on request
  • Vendor-neutral — Dell, HPE, Supermicro, NVIDIA, AMD
Request a Quote
How we work

Four steps. No surprises.

Step 01

Scope & Quote

Share your SOW, drawings, or sites. Fixed-scope quote within 48 hours.

Step 02

Plan & Mobilize

Crew, certs, badges, ship-to-docks, rollout windows confirmed.

Step 03

Deploy & Validate

Daily photo + log updates. Documented hand-off when complete.

Step 04

Run & Support

24/7 smart hands kicks in. One ticket, one SLA, one number.

Let’s deploy

Ready to start server rack installation & build-out?

A senior engineer will get back to you within 24 hours — usually faster.